80m North Devon Wind Turbine rejected by Council

An application to build an 80 metre wind turbine on the edge of Fullabrook Wind Farm, has been rejected by North Devon Council because it would have been out of keeping with its surroundings.

The turbine would have produced 800kw if approved.

This entry was posted in From the Press. Bookmark the permalink.