Monthly Archives: December 2013

Wind farms handed £5 million to switch off turbines as thousands of homes left without power – Telegraph

This is the rubbish we are paying for! Wind farms handed £5 million to switch off turbines as thousands of homes left without power – Telegraph.

Posted in From the Press | Comments Off on Wind farms handed £5 million to switch off turbines as thousands of homes left without power – Telegraph

Mabrake Blog – 2013 in review

The WordPress.com stats helper monkeys prepared a 2013 annual report for this blog. Here’s an excerpt: A New York City subway train holds 1,200 people. This blog was viewed about 5,700 times in 2013. If it were a NYC subway … Continue reading

Posted in General Updates | Comments Off on Mabrake Blog – 2013 in review

New Legislation approved – Hub Height exceeding 15m – Consultation must be carried out prior to Application being submitted

I am pleased to advise everyone that as Geoffrey Cox predicted Legislation has been approved by Parliament which now ensures that Consultation must be carried out prior to any application for Two or more Turbines or if Hub height of … Continue reading

Posted in General Updates | Comments Off on New Legislation approved – Hub Height exceeding 15m – Consultation must be carried out prior to Application being submitted

Wind farm ‘blight’ cutting value of homes by up to 33%, says MP | Exeter Express and Echo

Geoffrey Cox speaks out once more:- Wind farm ‘blight’ cutting value of homes by up to 33%, says MP | Exeter Express and Echo.

Posted in From the Press | Comments Off on Wind farm ‘blight’ cutting value of homes by up to 33%, says MP | Exeter Express and Echo

£30 Million For Wind Turbines To Shut Down | The Global Warming Policy Foundation GWPF

£30 Million For Wind Turbines To Shut Down | The Global Warming Policy Foundation GWPF.

Posted in From the Press | Comments Off on £30 Million For Wind Turbines To Shut Down | The Global Warming Policy Foundation GWPF